RPSEA Logo Secure Energy for America
 
 
 

RPSEA

1650 Highway 6 Suite 325
Sugar Land, TX 77478
(281) 313-9555

 

Optimization of Infill Well Locations in Wamsutter Field (07122-43)

The University of Tulsa - Principal Investigator:  Mohan Kelkar, PhD

Objective:  The project objective is to develop a model and technique to determine the infield drilling needs of a tight gas reservoir.  The Wamsutter field will be used as a data source and field test site for the new technique.
 
Period of Performance:  September 2, 2008 to September 15, 2011

Abstract
NETL Fact Sheet
Presentations
Reports