Tubel LLC - Principal Investigator: Paul Tubel
Objective: The objective is to develop a safe system to optimize production for deployment in multilateral wells and increasing the life of the wells while decreasing the production costs. It will provide remote flow control capabilities inside the laterals using an electric, ultra-low power choke system with production data collection capability in real time.
Period of Performance: January 28, 2011 to January 28, 2013