DTC International, Inc. - Principal Investigator: Bill Parks
Objective: The objectives of this project are to develop a certified, ready to fabricate design for a subsea test tree (SSTT) and intervention riser system (IRS) as part of a fully integrated Subsea Well Intervention System (SWIS) that is capable of performing both thru-drilling riser intervention operations and open water riser intervention operations on subsea wells in water depths up to 12,000 feet and at working pressures up to 20,000 psig and working temperatures up to 350 °F.
Period of Performance: January 24, 2011 to January 24, 2012