2007 Ultra-Deepwater

Composite Riser for Ultra-Deepwater High Pressure Wells

Subcontractor: Lincoln Composites, Inc.

Principal Investigator: Don Baldwin
Project Number Project Status
07121-1401 Completed
RPSEA Project Manager: Bill Head
Participants
Stress Engineering Services
Period of Performance
Start Date End Date
December 5, 2008 June 3, 2013
Total Project Cost RPSEA Share Cost Share
$3,208,070.00 $2,071,507.00 $1,136,563.00
Project Objectives

Lincoln Composites is designing and testing a carbon fiber overwrapped 1" steel drilling riser pipe to produce a 20" ID x 15,000 psi WP for 10,000 water depths.

RPSEA Project Fact Sheet: Download 199.6 KB
Reports
File Type Date
Design and Verification Testing; Composite-reinforced Steel Drilling Riser ( 3.8 MB ) Final Report 09/11