2007 Ultra-Deepwater

Ultra-Deepwater Dry Tree System for Drilling and Production

Subcontractor: FloaTEC, LLC

Principal Investigator: Jing Kuang
Project Number Project Status
07121-1402a Completed
RPSEA Project Manager: James Pappas
Participants
J. Ray McDermott Engineering; Keppel Offshore & Marine; Vetco Gray, Inc.; Seawell Americas, Inc.; OTRC
Period of Performance
Start Date End Date
December 8, 2008 March 27, 2009
Total Project Cost RPSEA Share Cost Share
$394,515.00 $278,686.00 $115,829.00
Project Objectives

FloaTEC feasibility engineering studies are to be performed on their proprietary E-Semi and Truss Semi deepwater structure designs. These studies are related to enabling dry tree 10,000 foot water depth field developments where high payloads are required.

RPSEA Project Fact Sheet: Download 410.0 KB
Reports
File Type Date
Ultra-Deepwater Dry Tree System Drilling Production - Phase I Study - Option Screening Report ( 5.0 MB ) Final Report 06/09