2008 Small Producer

Field Demonstration of Alkaline Surfactant Polymer Floods in Mature Oil Reservoirs Brookshire Dome, Texas

Subcontractor: Layline Petroleum 1, LLC

Principal Investigator: Chris Lewis
Project Number Project Status
08123-02 Completed
RPSEA Project Manager: Martha Cather
Participants
Tiorco, LLC; The University of Texas at Austin
Period of Performance
Start Date End Date
December 1, 2009 November 1, 2012
Total Project Cost RPSEA Share Cost Share
$1,226,294.00 $585,571.00 $628,460.00
Project Objectives

This proposal aims to demonstrate through a field pilot implementation that the use of alkaline surfactant polymer (ASP) flooding in appropriately selected reservoirs can result in an incremental oil production of 10 to 20% of the original oil (15 to 30% of the remaining oil).

RPSEA Project Fact Sheet: Download 331.5 KB
Reports
File Type Date
Field Demonstration of Alkaline Surfactant Polymer Floods in Mature Oil Reservoirs Brookshire Dome, Texas ( 2.8 MB ) Final Report 10/12