2009 Ultra-Deepwater

Intelligent Production System for Ultra-Deepwater with Short Hop Wireless Power and Wireless Data Transfer for Lateral Production Control and Optimization

Subcontractor: Tubel LLC

Principal Investigator: Paul Tubel
Project Number Project Status
09121-3500-01 Completed
RPSEA Project Manager: James Pappas
Participants
University of Houston
Period of Performance
Start Date End Date
January 28, 2011 March 28, 2013
Total Project Cost RPSEA Share Cost Share
$1,424,400.00 $1,088,756.00 $321,400.00
Project Objectives

The objective is to develop a safe system to optimize production for deployment in multilateral wells and increasing the life of the wells while decreasing the production costs. It will provide remote flow control capabilities inside the laterals using an electric, ultra-low power choke system with production data collection capability in real time.

RPSEA Project Fact Sheet: Download 238.1 KB
Reports
File Type Date
Intelligent Production System for Ultra Deepwater with Short Hop Wireless Power and Wireless Data Transfer for Lateral Production Control and Optimization ( 1014.1 KB ) Final Report 03/13