2010 Ultra-Deepwater

Ultra-Deepwater Dry Tree System for Drilling and Production in the Gulf of Mexico, Phase 2

Subcontractor: Det Norske Veritas (USA), Inc.

Principal Investigator: Jenny Yan Lu
Project Number Project Status
10121-4405-02 Active
RPSEA Project Manager: Bill Head
Period of Performance
Start Date End Date
September 27, 2012 December 1, 2014
Total Project Cost RPSEA Share Cost Share
$2,982,822.00 $2,104,567.00 $848,427.00
Project Objectives

The primary objective of this project is to mature two concepts of very large floating systems that are suitable for drilling and production in up to 10,000-foot GOM Ultra-Deepwater using conventional dry trees.

RPSEA Project Fact Sheet: Download 204.1 KB
Presentations
Title: PHASE 1 FINAL PRESENTATION: Ultra-Deepwater Dry Tree System for Drilling and Production in the Gulf of Mexico - 09/14 ( 1.4 MB )