2011 Ultra-Deepwater

Deepwater Permanent Subsea Pressure Compensated Chemical Reservoir

Subcontractor: Safe Marine Transfer LLC

Principal Investigator: James Chitwood
Project Number Project Status
11121-5302-01 Active
RPSEA Project Manager: Bill Fincham
Participants
Alan C. McClure Assoc. Inc.; Canyon Offshore, Inc.; Stress Engineering Services Inc.; OceanWorks International, Inc.
Period of Performance
Start Date End Date
May 9, 2014 September 18, 2016
Total Project Cost RPSEA Share Cost Share
$6,186,151.00 $4,605,178.00 $1,519,111.00
Project Objectives

The project’s objective is to develop a functional and qualified subsea chemical storage and injection system design with an effective 3,000+ barrel chemical storage volume. The size of the chemical storage dominates the operational constraints for this system. There are several viable approaches to replenishing the chemistry and installation of the facility. Proven technology with economic factors is expected to dominate the selection of these installation and maintenance approaches as the technology for this objective is matured.

 

View members only files associated with this project.

RPSEA Project Fact Sheet: Download 264.7 KB
Reports
File Type Date
Deepwater Subsea Pressure Compensated Chemical Reservoir ( 1.5 MB ) Stage 1 Final Report 08/15
Presentations
Title: Stage 1 Final Presentation - Deepwater Subsea Pressure Compensated Chemical Reservoir - 06/15 ( 1.8 MB )
Pictures
Download Original Picture Size
Tags: featured