2011 Unconventional Resources

Advanced Treatment of Shale Gas Fracturing Water to Produce NPDES Quality Water

Subcontractor: Southern Research Institute

Principal Investigator: Corey Tyree
Project Number Project Status
11122-57 Completed
RPSEA Project Manager: Sandy McSurdy
Participants
M2 Water Treatment; BKT United
Period of Performance
Start Date End Date
April 30, 2013 October 30, 2015
Total Project Cost RPSEA Share Cost Share
$2,364,176.00 $1,815,189.00 $525,345.00
Project Objectives

The overall objectives of this project are to determine if an integrated approach using magnetic ballast clarification (MBC), vortex-generating (FMX) and nano-filtration (NF) membranes, and hydrogel media or precipitation/solidification/stabilization can:

  1. Produce water suitable for national pollutant discharge elimination system (NPDES) discharge and/or beneficial reuse pursuant to state regulations.
  2. Produce a brine slurry with metal concentrations below detection; and
  3. Volumetrically decrease the metals waste to be disposed of and solidify/stabilize solid wastes for subsequent disposal.
RPSEA Project Fact Sheet: Download 286.9 KB
Reports
File Type Date
Advanced Treatment of Shale Gas Fracturing Water to Produce Re-use or Discharge Quality Water ( 1.7 MB ) Final Report 11/15
Tags: featured