2011 Small Producer

Study and Pilot Test of Preformed Particle Gel Conformance Control Combined with Surfactant Treatment

Subcontractor: The University of Missouri

Principal Investigator: Baojun Bai
Project Number Project Status
11123-14 Completed
RPSEA Project Manager: Joe Renk
Participants
Blue Top Energy, LLC; Colt Energy, LLC; TMD Energy, Brentwood; Baker Hughes Company
Period of Performance
Start Date End Date
November 6, 2012 August 31, 2015
Total Project Cost RPSEA Share Cost Share
$1,763,315.00 $845,820.00 $899,862.00
Project Objectives

The objectives of the project are to: (1) test the extent to which the coupled method can improve both sweep efficiency and microscopic efficiency, thus improving overall oil production for small producers through extensive lab tests and field pilot tests; (2) evaluate whether particle gel treatment and the coupled process can be used to control water production and improve oil recovery for the well candidates owned by small producers.

 

RPSEA Project Fact Sheet: Download 224.3 KB
Reports
File Type Date
Study and Pilot Test of Preformed Particle Gel Conformance Control Combined with Surfactant Treatment ( 3.5 MB ) Final Report 09/15