2012 Ultra-Deepwater

Reliability of Annular Pressure Buildup (APB) Mitigation Technologies

Subcontractor: Blade Energy Partners, Ltd

Principal Investigator: Robert M. Pilko
Project Number Project Status
12121-6502-01 Completed
RPSEA Project Manager: Rob Vagnetti
Period of Performance
Start Date End Date
July 28, 2014 December 15, 2015
Total Project Cost RPSEA Share Cost Share
$828,074.00 $654,178.00 $165,615.00
Project Objectives

Annular Pressure Buildup (APB) occurs in all wells with high bottom hole temperature, multiple casing strings and annuli that cannot be vented --- which includes most deepwater Gulf of Mexico wells.  APB can result in casing string and premature well failure, unless a well is properly designed, APB risks are fully assessed for all load cases, and any necessary APB mitigation methods are evaluated, fully analyzed for effectiveness, and properly implemented.

This project  covers the RPSEA RFP requirements of analyzing APB mitigation technologies. Moreover, will provide industry with a stochastic tool for analysis, comparison, and choice of possible APB mitigation techniques applicable to an operator's well and field situation.

 

View members only files associated with this project.

RPSEA Project Fact Sheet: Download 233.4 KB
Reports
File Type Date
Reliability of Annular Pressure Buildup (APB) Mitigation Technologies ( 3.4 MB ) Final Report 03/16